In the Field · Part 4

Sewer and drain II: trenchless vs. open trench, whose lateral it is (it varies by city), backwater valves, and point-of-sale lateral ordinances

Lesson 8 of 27~13 minFree previewCurrent as of September 2026Leer en español

When the camera shows a lateral that has to be replaced, the plumber has three questions before a price: how (open trench, pipe bursting, or a cured-in-place liner), whose pipe it is (in some California cities the owner is responsible all the way to the main, including under the street; in others the city owns the lower lateral from the property line), and what the city requires at the connection (an encroachment permit, a backwater valve, a cleanout at the property line). This lesson answers each with the method, gives the backwater valve rule that protects a low fixture and the customer's insurance claim, and explains the East Bay's point-of-sale lateral program as the model for the ordinances a plumber has to know before quoting a sewer job near a sale.

What the full lesson covers

  • Open trench replaces the line and lets you fix the grade; pipe bursting replaces it through the old path with one pit at each end and cannot fix a belly; a cured-in-place liner rehabilitates the existing pipe from the inside and depends on the host pipe's shape. Match the method to what the camera and locator showed.
  • Whose lateral: in unincorporated Los Angeles County the owner maintains the entire lateral to the main, including under the street (LACC 20.24.080); some cities own the lower lateral from the property line; every job starts with the city's ordinance and, for the street portion, an encroachment permit.
  • A fixture on a floor lower than the next upstream manhole cover must be protected by a backwater valve, and fixtures above that level must not discharge through it (CPC 710.1). The basement bathroom and the sunken laundry are the candidates; the valve is a permitted job.
  • Point-of-sale ordinances: in the East Bay PSL program area, a Certificate of Compliance is required at transfer of title, at a remodel of $100,000 or more, or at a meter size change, before escrow can close. Other cities have their own; a sewer job near a sale is quoted against the program's test, not just the camera.
  • Every lateral job: one-call notice before digging, the trenching rules, the permit, the inspection before backfill, and a video before and after.

Unlock the full lesson

This is the public summary. The full lesson has the method, the worked cases, the checklists and the templates:

  • All in-depth lessons, exam prep and After the License
  • 1,000+ practice questions
  • AI tutor (100 messages included)
  • 14+ hours of audio lessons
  • Full-length practice exams
  • Pass guarantee
Start Free — Create Account$149 one-time · lifetime access · no subscription

Already have an account? Sign in

More lessons in The Field: Method, Code, and Cases

Get Help