In the Field · Part 4

Permits: when one is required, what is exempt, pulling it online, the inspection sequence, what inspectors look for, and handling corrections

Lesson 2 of 27~12 minFree previewCurrent as of September 2026Leer en español

The permit is where the field meets the license record. Section 104.1 of the California Plumbing Code makes it unlawful to install, alter, repair, replace, or remodel a plumbing system without a permit, and section 104.2 exempts exactly two things: stopping leaks without replacing pipe, and clearing stoppages or repairing leaks without replacing or rearranging anything. A water heater replacement, a repipe, a sewer lateral, a new gas line, a moved fixture: all permits. This lesson lays out the line between exempt and permitted work, how the big cities issue residential plumbing permits online, the rough-to-final inspection sequence, what inspectors check on the jobs a C-36 does most, and how to handle a correction notice without losing the customer or the day.

What the full lesson covers

  • Permit required (CPC 104.1) for any installation, alteration, repair, replacement, or remodel of a plumbing system. Exempt (104.2): stopping a leak in a drain or vent without replacing the pipe; clearing a stoppage, including pulling and resetting a toilet; repairing a leak in a pipe, valve, or fixture without replacing or rearranging any pipe, valve, or fixture. Everything else, including the water heater, is a permit.
  • Willful disregard of permit laws is cause for discipline under B&P 7110, and it is the most common CSLB complaint that starts with a happy customer and ends with an unhappy one at resale.
  • Most California cities issue routine residential plumbing permits (water heater, repipe, sewer, gas line) online to a licensed contractor in minutes; the permit fee goes into the estimate as a pass-through and the inspection visit into the labor units.
  • The sequence is underground, rough (with a water test on DWV and an air or water test on supply and gas), and final; the inspector looks at slope, cleanouts, vents, trap arms, strapping, T&P discharge, expansion tank, sediment trap, bonding, and pressure test results.
  • A correction notice is a list, not a verdict: fix the items, call for reinspection, keep the customer informed, and never argue on site.

Unlock the full lesson

This is the public summary. The full lesson has the method, the worked cases, the checklists and the templates:

  • All in-depth lessons, exam prep and After the License
  • 1,000+ practice questions
  • AI tutor (100 messages included)
  • 14+ hours of audio lessons
  • Full-length practice exams
  • Pass guarantee
Start Free — Create Account$149 one-time · lifetime access · no subscription

Already have an account? Sign in

More lessons in The Field: Method, Code, and Cases

Get Help