One page per job, in the order the day runs: before leaving the yard, at the door, at the work area, during the work, at the end of the day, and at the walk-through. Every line traces to a lesson in this track; most of them are the difference between a job the customer recommends and one they remember for the wrong reason.
What the full lesson covers
- Print one per job; the completed sheet goes in the job folder with the photos.
- The "before leaving" block is where the permit, the one-call ticket, the contract copy, and the RRP pamphlet are confirmed; the day cannot recover from missing them.
- The "end of day" block is a text to the customer and a clean path, every day, on every multi-day job.
- The walk-through block is the punch list, the shutoff tour, the release, and the review ask.
Unlock the full lesson
This is the public summary. The full lesson has the method, the worked cases, the checklists and the templates:
- All in-depth lessons, exam prep and After the License
- 1,200+ practice questions
- AI tutor (100 messages included)
- 18+ hours of audio lessons
- Full-length practice exams
- Pass guarantee
More lessons in The Field: Method, Code, and Cases
- 1The diagnostic method: verify, isolate, cheapest test first, cause not symptom, the options ladder, document
- 2Permits: when one is required, what is exempt, pulling it online, the inspection sequence, what inspectors look for, and handling corrections
- 3Daily-use code: drainage slope, venting, water sizing, cleanouts, trap arms, and fixture units, with the section for each
- 4Gas piping in practice: sizing, CSST bonding, the pressure test, appliance connectors and shutoffs, sediment traps, and seismic shutoff valves