In the Field · Part 4
Template: the Heat Illness Prevention Plan for a plumbing shop, outdoor and indoor
The written plan both heat standards require, in one document sized to a plumbing crew: water, shade and cool-down areas, the temperature triggers (80 °F outdoors for shade, 95 °F for high-heat procedures, 82 °F indoors), acclimatization for the new hire and the first heat wave, the emergency steps, and the training log. Print it, fill it in, translate it if your crew's language is not English, and keep it on the truck.
What the full lesson covers
- Water: fresh, cool, free, close, at least a quart per employee per hour; encouraged, not just available.
- Shade outdoors when it exceeds 80 °F and on request at any temperature; a cool-down area indoors when it reaches 82 °F.
- High-heat procedures at 95 °F outdoors: observation, communication, a net ten-minute preventative cool-down every two hours, and a pre-shift meeting.
- Acclimatize new employees for their first 14 days and everyone during a heat wave; watch, and lighten the work.
- Emergency: recognize the signs, cool the person immediately, call 911 for any severe symptom, and give responders clear directions to the job site.
Unlock the full lesson
This is the public summary. The full lesson has the method, the worked cases, the checklists and the templates:
- All in-depth lessons, exam prep and After the License
- 1,000+ practice questions
- AI tutor (100 messages included)
- 14+ hours of audio lessons
- Full-length practice exams
- Pass guarantee
Start Free — Create Account$149 one-time · lifetime access · no subscription
Already have an account? Sign in
More lessons in The Field: Method, Code, and Cases
- 1The diagnostic method: verify, isolate, cheapest test first, cause not symptom, the options ladder, document
- 2Permits: when one is required, what is exempt, pulling it online, the inspection sequence, what inspectors look for, and handling corrections
- 3Daily-use code: drainage slope, venting, water sizing, cleanouts, trap arms, and fixture units, with the section for each
- 4Gas piping in practice: sizing, CSST bonding, the pressure test, appliance connectors and shutoffs, sediment traps, and seismic shutoff valves
- 5Water heaters I: tank. Seismic strapping, the T&P discharge line, expansion tanks, sediment traps, pans, venting, and the garage rules
- 6Water heaters II: tankless and heat pump. Gas sizing, venting, condensate, the 2025 Energy Code direction, and where the gas-ban ordinances stand
- 7Sewer and drain I: the camera, the locator, hydro-jetting vs. cabling, and when each is the right tool
- 8Sewer and drain II: trenchless vs. open trench, whose lateral it is (it varies by city), backwater valves, and point-of-sale lateral ordinances
- 9Case: the hissing line. The meter test, the supply leak that fed the roots, the lateral to the city tap, and the contract and permit trail
- 10Leak detection: slab leaks, acoustic and pressure methods, thermal imaging, and repipe vs. reroute
- 11Low pressure: the PRV, galvanized pipe, and the sequence that finds which one it is
- 12Sewer gas: trap seals, trap primers, vents, and the sequence that finds the smell
- 13Water treatment: where softeners are restricted in California, filtration, pressure regulators, and thermal expansion
- 14Fixtures and conservation: CALGreen flow rates, SB 407 retrofit-on-alteration and disclosure-on-sale, 1.28 gpf, and the ADA basics a plumber needs
- 15Materials and methods: PEX vs. copper vs. CPVC, ABS vs. PVC (it is regional), cast iron, and the transitions that fail
- 16Commercial basics: grease interceptors, the backflow program, and the tester certification that opens a second line of work
- 17Cal/OSHA for a small shop: the IIPP every employer must have, heat illness prevention, trenching and the 5-foot permit, confined space, silica, and ladders
- 18Environmental rules: EPA lead-safe certification for any pre-1978 home, asbestos and transite pipe, and stormwater
- 19Job-site craft: sequencing with the other trades, protecting the home, and the punch list that ends the job
- 20Case: the water heater that failed inspection twice
- 21Case: the gas leak call. The protocol, and the walk-away
- 22Case: the "customer doesn't want a permit" job
- 23Template: the job-site checklist, from the truck to the walk-through
- 24Template: the pre-inspection checklist by stage. Underground, rough, water heater final, gas, and trim
- 25Template: the Injury and Illness Prevention Program starter for a plumbing shop of one to five
- 26Template: the Heat Illness Prevention Plan for a plumbing shop, outdoor and indoorYou are here
- 27Template: the customer options sheet (good / better / best) with the cost band, the permit path, and the code trail on each rung