Running the Business · Part 2

Template: the estimate worksheet, blank and worked

Lesson 11 of 13~6 minFree previewCurrent as of September 2026Leer en español

One sheet, used on every job that is not already in the price book, that walks the takeoff, labor units, loaded rate, materials, overhead, contingency, and margin in order and produces a price by division rather than by feel. The blank is followed by the same sheet filled in for a 50-gallon gas water heater replacement, so the format is never in doubt. Keep the finished sheet in the job folder; it is what a change order is measured against.

What the full lesson covers

  • Fill the sheet top to bottom; do not write a price until line 9.
  • The loaded labor rate and the overhead rate are computed once a year and written at the top of every sheet, so they are never guessed on a job.
  • Price equals cost divided by (1 minus target margin). The sheet shows the division so the markup mistake cannot happen.
  • The finished worksheet is the takeoff of record for the job; changes are measured against it.

Unlock the full lesson

This is the public summary. The full lesson has the method, the worked cases, the checklists and the templates:

  • All in-depth lessons, exam prep and After the License
  • 1,000+ practice questions
  • AI tutor (100 messages included)
  • 14+ hours of audio lessons
  • Full-length practice exams
  • Pass guarantee
Start Free — Create Account$149 one-time · lifetime access · no subscription

Already have an account? Sign in

More lessons in Getting Work

Get Help