60 free questions with answers, explanations and the official source for each. Answer one to see why. No sign-up.
0 of 0 right · 60 to go
1 / 60
Under Civil Code Section 8812, when must an owner who withheld a retention pay it to the direct contractor?
Civil Code Section 8812: if an owner withholds a retention from a direct contractor, the owner shall, within 45 days after completion of the work of improvement, pay the retention to the contractor.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8812
2 / 60
The owner of a commercial building records a notice of completion but never sends a copy to the plumbing subcontractor that gave the owner preliminary notice. Under Civil Code Section 8190, what is the effect for that subcontractor?
Civil Code Section 8190: an owner that records a notice of completion shall give a copy within 10 days to the direct contractor and to each claimant that gave the owner preliminary notice. If the owner fails to do so, the notice is ineffective to shorten that person's time to record a claim of lien.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8190
3 / 60
A homeowner seeks compensation from a contractor who posted a cashier's check with CSLB instead of a surety bond. According to CSLB's bond fact sheet, how is payment obtained from the cashier's check?
CSLB's bond fact sheet: when a contractor uses a cashier's check instead of a bond, the consumer must file a lawsuit against the licensee and the CSLB Registrar of Contractors, and CSLB can only make payment from a cashier's check under a court order.
Source: Fast Facts: License Bond (2025 update) (2025) p.2
4 / 60
Under Business and Professions Code Section 7159.5, what is the consequence for a licensee who accepts a downpayment larger than the section allows on a home improvement contract?
Business and Professions Code Section 7159.5(a): failure to comply with its provisions is cause for discipline. One of those provisions limits the downpayment to $1,000 or 10 percent of the contract amount, whichever is less.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7159.5
5 / 60
If a change order states the original total price was $3,000 and a change adds $500, what should the change order clearly state as the new total?
The change order should clearly state the new total contract price ($3,500) to avoid confusion. Both parties should understand the final amount owed.
Source: Arithmetic from the question
6 / 60
Under the Mechanics Lien Warning required by BPC Section 7159, how can a homeowner pay for a subcontractor's work after receiving that subcontractor's Preliminary Notice?
BPC Section 7159 (Mechanics Lien Warning): when it is time to pay for the work of a subcontractor or supplier who has given a Preliminary Notice, write a joint check payable to both the contractor and the subcontractor or material supplier.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7159
7 / 60
A candidate fails the C-36 trade exam. According to CSLB's examination FAQ, when may the candidate retake it?
CSLB's examination FAQ: candidates who fail are eligible to retake the examination after 21 calendar days, as long as they are not past their 18-month void date.
A plumbing contractor's license lapsed partway through a job, and the owner refuses to pay the balance. Under BPC Section 7031, what must the contractor allege in order to sue to collect compensation for the work?
BPC Section 7031: a person acting as a contractor may not bring or maintain an action to collect compensation for work requiring a license without alleging that they were a duly licensed contractor at all times during the performance of that act or contract, regardless of the merits of the claim.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7031
9 / 60
A homeowner made a progress payment and asked the contractor for full and unconditional releases from potential lien claimants for that work. Under BPC Section 7159.5, what may the homeowner do until the releases are furnished?
BPC Section 7159.5: on request, the contractor shall obtain and furnish a full and unconditional release for the work paid for, and the person contracting for home improvement may withhold all further payments until these releases are furnished.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7159.5
10 / 60
A subcontractor is owed $3,000 by the general contractor, who is still receiving progress payments from the owner. Under Civil Code Section 8520, which notice may the subcontractor give the owner so funds are withheld?
Civil Code Section 8520(a): a person that has a lien right, other than a direct contractor, may give the owner a stop payment notice. The owner then withholds funds due to the direct contractor to cover the claim, as the chapter provides.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8520
11 / 60
A homeowner's bathroom repipe contract depends on getting a loan, and the lender has yet to agree to make the loan. Under BPC Section 7163, what may the contractor do in the meantime?
BPC Section 7163: a home improvement contract that depends on obtaining a loan is unenforceable until the loan requirements are met, and until then the contractor may not deliver property or perform services other than obtaining building permits or similar preliminary services for which no mechanic's lien can be claimed.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7163
12 / 60
Under Civil Code Section 8508, a stop payment notice is valid only if the claimant gave any required preliminary notice and gave the stop payment notice when?
Civil Code Section 8508: a stop payment notice is valid only if the claimant gave preliminary notice as required and gave the stop payment notice before expiration of the time within which a claim of lien must be recorded.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8508
13 / 60
Under Civil Code Section 8200(e), to whom must a claimant with a direct contractual relationship with the owner give preliminary notice?
Civil Code Section 8200(e): a laborer is not required to give preliminary notice, and a claimant with a direct contractual relationship with an owner or reputed owner is required to give preliminary notice only to the construction lender or reputed construction lender, if any.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8200
14 / 60
A plumbing subcontractor records a claim of mechanics lien but never serves the owner a copy with the Notice of Mechanics Lien. Under Civil Code Section 8416, what is the result?
Civil Code Section 8416: failure to serve the copy of the claim of mechanics lien, including the Notice of Mechanics Lien, causes the claim of mechanics lien to be unenforceable as a matter of law.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8416
15 / 60
A plumbing contractor promises a homeowner a specific brand of toilet and sink for a bathroom remodel. Under BPC Section 7162, how must that promise be handled?
BPC Section 7162: a representation about the brand name, quality, or size of goods such as bathroom fixtures or a sink shall be set forth in writing in the contract or specifications, with a description including any brand name, model number, or similar designation.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7162
16 / 60
A general contractor receives the retention payment from the owner. Under Civil Code Section 8814, when must it pay the plumbing subcontractor its share of the retention?
Civil Code Section 8814: a direct contractor that withheld a retention from subcontractors shall, within 10 days after receiving all or part of a retention payment, pay each subcontractor its share.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8814
17 / 60
A plumbing company's employee answers an emergency repair call the homeowner requested and writes up only that repair. Under BPC Section 7152, does the employee need a home improvement salesperson registration?
BPC Section 7152: a bona fide service repairperson employed by a licensed contractor, whose call is limited to the service, repair, or emergency repair initially requested by the buyer, is not required to be registered as a home improvement salesperson.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7152
18 / 60
A homeowner cancels a home improvement contract in writing under the Three-Day Right to Cancel. Under BPC Section 7159, how soon after receiving the notice of cancellation must the contractor return what the homeowner paid?
BPC Section 7159 (Three-Day Right to Cancel notice): if the buyer cancels, the contractor must return anything paid within 10 days of receiving the notice of cancellation.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7159
19 / 60
After a license suspension, a plumbing contractor must file a disciplinary bond under BPC Section 7071.8. How is the amount of the disciplinary bond set?
BPC Section 7071.8: the disciplinary bond is in a sum fixed by the registrar based upon the seriousness of the violation, not less than $25,000 nor more than 10 times the regular contractor's bond amount, and it must remain on file for at least two years.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7071.8
20 / 60
Under Labor Code Section 227.3, when an employee with unused vested vacation is terminated, what happens to that vacation?
Labor Code Section 227.3: when an employee is terminated without having taken vested vacation, all vested vacation is paid as wages at the final rate, and an employment contract or policy cannot provide for forfeiting vested vacation on termination.
Source: Labor Code, cited sections LAB 227.3
21 / 60
Under Title 8 Section 14300.29, which forms does an employer use to record recordable injuries and illnesses?
Title 8 Section 14300.29: you must use Cal/OSHA 300, 300A and 301 forms, or equivalent forms, for recordable injuries and illnesses. The 300 is the log, the 300A the annual summary, and the 301 the incident report.
Source: CCR Title 8 outside the Construction Safety Orders (General Industry, Electrical, and other safety orders), cited sections T8 14300.29
22 / 60
A homeowner paid an unlicensed contractor for plumbing work. Under Business and Professions Code Section 7031(b), what may the homeowner sue to recover?
Business and Professions Code Section 7031(b): a person who utilizes the services of an unlicensed contractor may bring an action in any court of competent jurisdiction to recover all compensation paid to the unlicensed contractor. A CSLB citation is a separate matter.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7031
23 / 60
Under BPC Section 7159.14, when may a plumber collect payment on a service and repair contract?
BPC Section 7159.14: for a service and repair contract, payment shall not be due before the project is completed.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7159.14
24 / 60
A contractor who holds only a C-36 plumbing license starts to advertise electrical panel upgrades. Under BPC Section 7027.1, what is this?
BPC Section 7027.1: it is a misdemeanor to advertise for construction work unless the person holds a valid license in the classification so advertised. A violation is punishable by a fine of not less than $700 and not more than $1,000.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7027.1
25 / 60
How often must a C-36 license be renewed?
Business and Professions Code Section 7140: all contractor licenses expire two years from the last day of the month in which the license is issued, or two years from the date the renewed license last expired. To renew, the licensee applies and pays the renewal fee before expiration.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7140
26 / 60
A plumbing contractor wants to hand out promotional gifts to prospective home improvement customers, with no contract required. Under BPC Section 7157, what is the maximum value of one such gift?
BPC Section 7157: a contractor may give a promotional gift, not conditioned on a contract, if the gift does not exceed a value of $5 and only one such gift is given in connection with any one transaction.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7157
27 / 60
Under Title 8 Section 14300.7, which work-related injury is recordable on the Cal/OSHA Form 300 log?
Title 8 Section 14300.7: a case is recordable if it results in death, days away from work, restricted work or transfer to another job, medical treatment beyond first aid, or loss of consciousness, or is a significant diagnosed injury or illness.
Source: CCR Title 8 outside the Construction Safety Orders (General Industry, Electrical, and other safety orders), cited sections T8 14300.7
28 / 60
Under Civil Code Section 8416, what must a claim of mechanics lien contain?
Civil Code Section 8416(a): a claim of mechanics lien is a written statement, signed and verified by the claimant, containing the claimant's demand after credits and offsets, the owner or reputed owner, a general statement of the work, the person who employed the claimant, a description of the site sufficient for identification, the claimant's address, and a proof of service affidavit.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8416
29 / 60
Under the CSLB Law and Business book, when the registrar's decision revokes a contractor's license, what waiting period applies before the license may be reinstated or reissued?
CSLB Law and Business book: with a revocation, the licensee's right to contract is taken away, and the license shall not be reinstated or reissued for one to five years from the effective date of the decision.
Source: Contractors State License Law & Reference Book, 2026 (B&P, CCR Title 16 Division 8, related codes) (2026) p.26
30 / 60
A registered home improvement salesperson negotiates a water heater replacement contract for a plumbing contractor. Under BPC Section 7159, what must the contract include about the salesperson?
BPC Section 7159: a home improvement contract includes, if applicable, the name and registration number of the home improvement salesperson that solicited or negotiated the contract.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7159
31 / 60
Under Civil Code Section 8536, what does a stop payment notice (formerly "stop notice") do when given to a construction lender?
Civil Code Section 8536(a): on receipt of a stop payment notice, a construction lender shall withhold from the borrower or other person it pays out of the construction fund sufficient funds to pay the claim stated in the notice, except as subdivision (b) allows.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8536
32 / 60
Under Civil Code Section 8060, where is a claim of lien (mechanics lien) recorded?
Civil Code Section 8060(b): recording a notice, claim of lien, release of lien, payment bond or other paper is done by filing it for record in the office of the county recorder of the county where the work of improvement is situated.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8060
33 / 60
A license applicant was previously cited for contracting without a license, the citation became a final order, and the violation caused substantial injury to the public. Under BPC Section 7071.6, what contractor's bond may the board require?
BPC Section 7071.6 sets the contractor's bond, and lets the board require an applicant to post a contractor's bond in twice the amount normally required, until the license is renewed, when the applicant was convicted of or cited for unlicensed contracting (the citation being a final order) and the violation constituted a substantial injury to the public.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7071.6
34 / 60
A journey-level plumber works as an employee of a licensed C-36 contractor, is paid only wages, does not run an independent business, and does not control the final results of the work. Under BPC Section 7053, does this plumber need a contractor's license?
BPC Section 7053: the license law does not apply to a person working as an employee who receives wages as their sole compensation, does not customarily engage in an independently established business, and does not control the manner of performance so as to determine the final results.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7053
35 / 60
A plumbing contractor moves the business to a new business address. Under BPC Section 7083, how long does the licensee have to notify the registrar in writing?
BPC Section 7083: licensees must notify the registrar in writing, on the registrar's form, within 90 days of any change to recorded information, including changes in business address, personnel, and business name. Failing to do so is grounds for disciplinary action.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7083
36 / 60
A plumber serves as the qualifier for two companies, and one company's license is revoked. Under BPC Section 7098, what may happen to the other license for which the plumber furnished the qualifying experience?
BPC Section 7098: when any license has been revoked, any additional license issued in the name of the licensee, or for which the licensee furnished qualifying experience and appearance, may be revoked by the registrar without further notice.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7098
37 / 60
A plumbing contractor records a mechanics lien. The owner wants to release the property by recording a lien release bond. Under Civil Code Section 8424, what amount must the bond be?
Civil Code Section 8424: the bond shall be in an amount equal to 125 percent of the amount of the claim of lien (or 125 percent of the amount allocated in the claim of lien to the real property to be released).
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8424
38 / 60
A sole owner plumbing contractor filed a workers' compensation exemption, then hired two helpers without getting workers' compensation coverage. Under BPC Section 7125.4, what is the minimum civil penalty per violation?
BPC Section 7125.4: employing workers without maintaining workers' compensation coverage is cause for discipline, with a minimum civil penalty of $10,000 per violation for a sole owner licensee and $20,000 per violation for a partnership, corporation, or limited liability company.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7125.4
39 / 60
A subcontractor never served a preliminary notice. What impact does this have on their mechanics lien rights?
Civil Code Section 8204(a): a preliminary notice is due not later than 20 days after the claimant first furnishes work. A claimant who did not give one may give it later, but may record a lien, give a stop payment notice, or claim against a payment bond only for work performed within 20 days before the notice is served.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8204
40 / 60
A person with one prior conviction for unlicensed contracting is convicted again under BPC Section 7028 for a $40,000 repipe contract. Based on the contract price, what fine must the court impose?
BPC Section 7028: after a prior conviction, the court shall impose a fine of 20 percent of the contract price (or of the payments made), or $5,000, whichever is greater. 20 percent of $40,000 is $8,000, which is greater than $5,000.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7028
41 / 60
A contractor's license was suspended when its bond was canceled. A new bond with an effective date of March 1 reaches the registrar on April 15. Under BPC Section 7071.7, how does the registrar treat the new bond?
BPC Section 7071.7: the registrar accepts a bond as of the effective date shown on it if the bond is received within 90 days after that date, and reinstates the license, if otherwise eligible, retroactive to the effective date of the bond. April 15 is within 90 days of March 1.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7071.7
42 / 60
Under Civil Code Section 1689.6, until when may a buyer cancel a home solicitation contract (for example, a home improvement contract signed at the home)?
Civil Code Section 1689.6: the buyer has the right to cancel a home solicitation contract until midnight of the third business day, or until midnight of the fifth business day if the buyer is a senior citizen, after the day the buyer signs.
A homeowner calls a plumber at night because a burst pipe is flooding the house, and wants the work to start right away. Under Civil Code Section 1689.13, how can the buyer waive the right to cancel for this emergency repair?
Civil Code Section 1689.13: for a buyer-initiated contract for emergency or immediately necessary repairs, the buyer gives the seller a separate statement that is dated and signed, describes the situation that requires immediate remedy, and expressly acknowledges and waives the right to cancel.
A C-36 contractor licensed as an individual (sole owner) dies with three jobs in progress. Under BPC Section 7076, what may an immediate member of the family do after the death?
BPC Section 7076: an individual license is canceled upon the death of the licensee. An immediate member of the family may request a continuance of the license to complete projects in progress and undertake new work for a reasonable time; the written request must be received at CSLB headquarters within 90 days after the death. The family member must later get their own license.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7076
45 / 60
Under Business and Professions Code Section 7159, the Three-Day Right to Cancel notice in a home improvement contract must be in what minimum type size?
Business and Professions Code Section 7159: the "Three-Day Right to Cancel" notice must comply with several rules, including that the text of the notice is at least 12-point boldface type and is in immediate proximity to a space for the owner’s signature.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7159
46 / 60
Under Civil Code Section 8200, which of these claimants is excused from giving preliminary notice?
Civil Code Section 8200: a laborer is not required to give preliminary notice. Subcontractors, material suppliers, and equipment lessors must give it before recording a lien claim.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8200
47 / 60
Under Title 8 Section 342, how must an employer report a serious work-related injury to Cal/OSHA?
Title 8 Section 342: the report is made immediately, meaning as soon as practically possible but not longer than 8 hours after the employer knows or with diligent inquiry would have known of the serious injury or illness.
Source: CCR Title 8 outside the Construction Safety Orders (General Industry, Electrical, and other safety orders), cited sections T8 342
48 / 60
What does it mean if CSLB places a contractor on probation?
CSLB Law and Business: probation is a stay of suspension or revocation. The licensee must abide by certain terms and conditions to keep the suspension or revocation from going into effect, and must file a disciplinary bond to stay in business during that period.
Source: Contractors State License Law & Reference Book, 2026 (B&P, CCR Title 16 Division 8, related codes) (2026) p.26
49 / 60
What is the consequence of allowing a C-36 license to expire without renewal?
Business and Professions Code Section 7141(a): an expired license may be renewed at any time within five years after its expiration by filing a renewal application and paying the renewal fee. Contracting on an expired license is unlicensed contracting.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7141
50 / 60
Two plumbing contractors form joint venture for $500,000 municipal project. How must it be licensed?
Business and Professions Code Section 7029: a joint venture license is a license issued to any combination of individuals, corporations, LLCs, partnerships, or other joint ventures, each of which holds a current, active license in good standing. Two contractors acting together as a joint venture need this license.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7029
51 / 60
A general contractor pays a plumbing subcontractor's retention late. Under Civil Code Section 8818, what penalty does the general contractor owe?
Civil Code Section 8818: an owner or direct contractor that does not make a retention payment on time is liable for a penalty of 2 percent per month on the amount wrongfully withheld, in place of any interest otherwise due.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8818
52 / 60
Under Title 8 Section 3203, what must an employer's documentation of safety and health training include for each employee?
Title 8 Section 3203: documentation of safety and health training for each employee includes employee name or other identifier, training dates, type(s) of training, and training providers. This documentation shall be maintained for at least one (1) year.
Source: CCR Title 8 outside the Construction Safety Orders (General Industry, Electrical, and other safety orders), cited sections T8 3203
53 / 60
According to the CSLB advertising guidelines, how must a C-36 plumbing contractor display its business name, address, and license number on each commercially-registered vehicle?
CSLB advertising guidelines: C-36 Plumbing contractors must display their business name and address and license number on each side of every commercially-registered vehicle in letters at least 1 ½ inches high.
Source: Advertising Guidelines p.1
54 / 60
A plumbing corporation is qualified by a responsible managing officer (RMO). Under BPC Section 7071.9, when is the RMO excused from filing the $25,000 qualifying individual's bond?
BPC Section 7071.9 requires a qualifying individual who is not the proprietor or a general partner to file a $25,000 qualifying individual's bond, but a responsible managing officer who owns 10 percent or more of the voting stock of the corporation, and certifies that fact on the registrar's form, is not required to file it.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7071.9
55 / 60
According to CSLB's licensing guide, which solar energy projects is a C-36 plumbing contractor authorized to perform?
CSLB's licensing guide lists the classifications allowed to do solar work: C-36 plumbing contractors are authorized to perform any project using solar equipment to heat water or fluids to a suitable temperature. Photovoltaic systems belong to classifications such as the C-46 Solar contractor.
Source: Get Licensed to Build (ENG0525) p.18
56 / 60
An owner-builder personally did all the work on a new house on their own lot and lists it for sale four months after completion. Under BPC Section 7044, what does offering the house for sale at that time create?
BPC Section 7044: the owner-builder exemption depends on the structure not being intended or offered for sale. Proof of the sale or offering for sale of a structure within one year after completion is a rebuttable presumption that it was undertaken for purposes of sale, which can defeat the exemption.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7044
57 / 60
An unlicensed handyman is asked to repipe a house for $4,000 and offers to write the job as five separate contracts of $800 each. Under BPC Section 7048, does the minor-work exemption apply?
BPC Section 7048 does not apply when a division of the operation is made in contracts of amounts less than $1,000 for the purpose of evasion of the license law or otherwise. The $4,000 repipe is one operation and needs a licensed contractor.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7048
58 / 60
According to the CSLB licensing guide, which experience is credited toward the four-year qualifying experience requirement?
CSLB licensing guide: credit is given only for experience as a journeyperson, foreperson, supervising employee, or contractor. A journeyperson is an experienced worker who can perform the trade without supervision, or someone who has completed an apprenticeship program.
Source: Get Licensed to Build (ENG0525) p.13
59 / 60
Before work begins, an owner files the direct contract with the county recorder and records the direct contractor's payment bond so that Civil Code Section 8600 applies. What is the minimum amount of that payment bond?
Civil Code Section 8600: the section applies if, before the commencement of work, the owner files the direct contract with the county recorder and records a payment bond of the direct contractor in an amount not less than 50 percent of the price stated in the direct contract.
Source: Civil Code, Division 4, Part 6 (Works of Improvement: liens, stop payment notices, payment bonds, retention) CIV 8600
60 / 60
Under BPC Section 7159, what must a contractor give the buyer before any work is started on a home improvement contract?
BPC Section 7159: before any work is started, the contractor shall give the buyer a copy of the contract signed and dated by both the contractor and the buyer. The buyer's receipt of that copy starts the buyer's rights to cancel.
Source: Business and Professions Code, Division 3, Chapter 9 (Contractors State License Law) BPC 7159